Go back

J0709+0458

We have performed 6 observation of J0709+0458, for a total of 0.9 hours across 1 project over 142 days occupying about 3.0 GB of raw data.
UTC Project Length [m] Beam BW [MHz] Nchan Band Nbin Nant Nanteff DM fold DM meerpipe RM meerpipe S/N backend S/N meerpipe
2020-09-11-06:34:01 PTA 8.5 4 856.00 1024 L-band 1024 56 56 44.2841 0.00000 0.00 128.7 0.0
2020-09-10-07:22:02 PTA 8.5 4 856.00 1024 L-band 1024 52 52 44.2841 0.00000 0.00 31.0 0.0
2020-09-05-03:50:34 PTA 8.5 4 856.00 1024 L-band 1024 58 58 44.2841 0.00000 0.00 9.5 0.0
2020-09-03-05:55:43 PTA 8.5 4 856.00 1024 L-band 1024 53 53 44.2841 0.00000 0.00 11.8 0.0
2020-08-24-04:09:16 PTA 8.5 2 856.00 1024 L-band 1024 56 56 44.2841 0.00000 0.00 75.9 0.0
2020-04-22-16:11:50 PTA 8.6 2 856.00 1024 L-band 1024 59 59 44.2841 0.00000 0.00 73.4 0.0