Go back

J0905-6019

We have performed 4 observation of J0905-6019, for a total of 0.2 hours across 1 project over 167 days occupying about 746.8 MB of raw data.
UTC Project Length [m] Beam BW [MHz] Nchan Band Nbin Nant Nanteff DM fold DM meerpipe RM meerpipe S/N backend S/N meerpipe
2019-10-28-02:01:06 TPA 3.4 1 775.75 928 L-band 1024 58 -1 91.4000 0.00000 0.00 120.3 0.0
2019-07-25-17:06:17 TPA 3.4 1 775.75 928 L-band 1024 58 -1 -1 0.00000 0.00 18.3 0.0
2019-07-14-16:33:40 TPA 3.4 1 775.75 928 L-band 1024 61 -1 -1 0.00000 0.00 145.5 0.0
2019-05-14-11:12:38 TPA 3.3 1 775.75 928 L-band 1024 54 -1 -1 0.00000 0.00 174.9 0.0