Go back

J1104-6103

We have performed 4 observation of J1104-6103, for a total of 0.2 hours across 1 project over 167 days occupying about 739.5 MB of raw data.
UTC Project Length [m] Beam BW [MHz] Nchan Band Nbin Nant Nanteff DM fold DM meerpipe RM meerpipe S/N backend S/N meerpipe
2019-10-28-03:06:20 TPA 3.4 1 775.75 928 L-band 1024 58 -1 78.5060 0.00000 0.00 80.4 0.0
2019-07-25-17:21:27 TPA 3.3 1 775.75 928 L-band 1024 58 -1 -1 0.00000 0.00 36.7 0.0
2019-07-14-16:37:35 TPA 3.3 1 775.75 928 L-band 1024 61 -1 -1 0.00000 0.00 42.4 0.0
2019-05-14-11:48:58 TPA 3.2 1 775.75 928 L-band 1024 49 -1 -1 0.00000 0.00 64.3 0.0