Go back

J1434-6006

We have performed 4 observation of J1434-6006, for a total of 0.3 hours across 1 project over 314 days occupying about 1014.2 MB of raw data.
UTC Project Length [m] Beam BW [MHz] Nchan Band Nbin Nant Nanteff DM fold DM meerpipe RM meerpipe S/N backend S/N meerpipe
2020-03-01-04:19:56 TPA 7.6 4 856.00 1024 L-band 1024 30 30 332 0.00000 0.00 18.9 0.0
2019-09-13-11:21:46 TPA 3.4 1 775.75 928 L-band 1024 61 -1 332 0.00000 0.00 28.8 0.0
2019-06-21-17:50:45 TPA 3.4 1 775.75 928 L-band 1024 61 -1 -1 0.00000 0.00 47.1 0.0
2019-04-23-00:16:45 TPA 3.3 1 775.75 928 L-band 1024 56 -1 -1 0.00000 0.00 24.1 0.0