Go back

J1604-4718

We have performed 5 observation of J1604-4718, for a total of 0.4 hours across 1 project over 254 days occupying about 1.3 GB of raw data.
UTC Project Length [m] Beam BW [MHz] Nchan Band Nbin Nant Nanteff DM fold DM meerpipe RM meerpipe S/N backend S/N meerpipe
2020-03-01-05:47:17 TPA 9.7 2 856.00 1024 L-band 1024 29 29 52 0.00000 0.00 51.0 0.0
2019-11-01-08:02:00 TPA 3.5 1 775.75 928 L-band 1024 57 -1 52 0.00000 0.00 18.2 0.0
2019-09-13-12:25:47 TPA 3.4 1 775.75 928 L-band 1024 61 -1 52 0.00000 0.00 28.0 0.0
2019-07-25-20:00:09 TPA 3.4 1 775.75 928 L-band 1024 58 -1 -1 0.00000 0.00 129.9 0.0
2019-06-21-19:31:47 TPA 3.4 1 775.75 928 L-band 1024 61 -1 -1 0.00000 0.00 36.9 0.0