Go back

J1610-5006

We have performed 4 observation of J1610-5006, for a total of 0.3 hours across 1 project over 182 days occupying about 965.2 MB of raw data.
UTC Project Length [m] Beam BW [MHz] Nchan Band Nbin Nant Nanteff DM fold DM meerpipe RM meerpipe S/N backend S/N meerpipe
2020-03-29-02:39:54 TPA 2.6 4 856.00 1024 L-band 1024 30 30 416 0.00000 0.00 76.4 0.0
2020-02-24-02:09:19 TPA 2.6 4 856.00 1024 L-band 1024 28 32 416 0.00000 0.00 117.3 0.0
2020-01-03-02:00:04 TPA 8.3 1 775.75 928 L-band 1024 57 57 416 0.00000 0.00 195.1 0.0
2019-09-29-11:13:49 TPA 3.4 1 775.75 928 L-band 1024 59 -1 416 0.00000 0.00 139.6 0.0