Go back

J1702-4128

We have performed 4 observation of J1702-4128, for a total of 0.2 hours across 2 projects over 17 days occupying about 751.8 MB of raw data.
UTC Project Length [m] Beam BW [MHz] Nchan Band Nbin Nant Nanteff DM fold DM meerpipe RM meerpipe S/N backend S/N meerpipe
2019-11-29-16:58:22 TPA 3.2 1 775.75 928 L-band 1024 55 55 367.1000 0.00000 0.00 76.9 0.0
2019-11-29-16:54:59 TPA 3.2 1 775.75 928 L-band 1024 55 55 367.1000 0.00000 0.00 75.0 0.0
2019-11-23-17:18:36 PTA 3.2 1 775.75 928 L-band 1024 60 60 367.1000 0.00000 0.00 58.0 0.0
2019-11-12-17:34:40 TPA 3.4 1 856.00 1024 L-band 1024 57 0 367.1000 0.00000 0.00 82.5 0.0